Help
End Section Review
End Exam
Answer Edit Confirmation
课程
活动
资料
反馈
题目内容
Highway Official: When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete. In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup. The cost of the electricity needed is substantially lower than the cost of the deicing salt we currently use.
Taxpayer: But ECC is vastly more expensive than standard concrete, so your proposal is probably not justifiable on economic grounds.
Which of the following, if true, could best be used by the highway official to support the official's proposal in the face of the taxpayer's objection?
还没有人评论,赶快抢个沙发~